Proposed Construction Project for the Single Lane Concrete Bridge

The WFPA has received the attached letter announcing plans to make changes to the single lane concrete bridge over Lynx Creek near the Big Bug intersection with Walker Road.

The letter includes an address for public comments.

Click on the link to see the letter.

http://walkerfire.org/wp-content/uploads/2014/04/Road-Project-Notices.pdf